Project Overview
Malcolm X Elementary School is a DC Public School located in Ward 8. The modernization will be roughly 63,000 square feet comprising a combination of renovation of the existing building and new construction. Throughout the building, the modernization will address Americans with Disabilities Act (ADA) requirements. Learning, instruction, and support technology will be brought up to cutting edge standards and capacity. The Project will be designed in such a way to incorporate, at a minimum, LEED for Schools – Gold principles.Â
In addition, DCPS is requiring the Project become a Net Zero energy building. The new modernized design shall allow for physical education (gym) and dining services (cafeteria) to take place simultaneously during the school day. Discovery commons spaces, small group rooms, and resource rooms will be integrated into design to accommodate special projects, collaborative work, and individual pull-out instruction.Â
Project Details
Location: 1500 Mississippi Ave. SE, Washington, DC 20032
Ward: 8
Design-Build Team: GCS-Sigal (GC) and CGS (Architect) Â
DCPS POC: Finan TesfaiÂ
DGS Project Manager: Rowan Alkaysi and Derek Riley (APM)Â Â
Start Date: Fall 2023
Project Completion: Summer 2026
Status: DesignÂ
Meeting Materials
Community Meeting: Construction Update June 12th, 2025
Community Meeting: Construction Update March 20th, 2025
SIT Presentation: Playground Visioning October 23rd, 2024
SIT Presentation: Design Development September 23rd, 2024
SIT Presentation: Schematics Design Feedback May 14th, 2024
SIT Presentation: Schematics Design Presentation May 8th, 2024
SIT Presentation: Concept Design Feedback February 12th 2024.
SIT Presentation: Concept Design February 6th 2024.
Kick Off SIT Presentation December 19th 2023Â
Community Meeting - June 12, 2023Â